The S:6 Base Builder Program: Block 6
Five down and one to go!
Our off-season is nearing its end and the competitive season is right around the corner. It’s time to put the finishing touches on our off-season Base Builder Program with our 6th and final block of training. To recap, our in-house group training program began back in November working from the low-intensity end of the energy system spectrum with pedaling skill work and aerobic intervals; then progressing through progressively higher intensity energy systems in monthly blocks: Aerobic Threshold (2-4 hour power), Anaerobic Threshold (32-64:00 power), Vo2 Max (8-16:00 power), and Anaerobic Power (1-4:00 power). The 6th and final block of our Base Build Program is the highest intensity (on-bike) energy system: Peak Power.
Peak Power is your top-end sprint power… Everything you’ve got of 4-8 seconds!
With the racing season approaching we plan to reach top-end intensity to finish off our off-season Base Build Program. This very same 24-week program is available as a downloadable training plan on Training Peaks ( 24-week Base Build Training Plan ). We also have a more condensed 12-week Base Build Training Plan available to those that prefer a shorter, faster build of early season base fitness. Both versions allow you to follow my programming on your own where ever you live!
Upon completion of our Base Build we’re ready for our competitive season of specialized training and racing. At this point we can then begin to back out the intensity while adding in more endurance training to meet our target race fitness goals.